MANUFACTURER PROCUREMENT

DALS lighting — direct procurement, pricing & lead times

Brilliant Light Source procures complete DALS packages under one contract — transparent net-plus-fee pricing, submittals and compliance handled, and lead times tracked from release to delivery. If DALS is on your fixture schedule, we price it, document it, and get it to the job site.

What BLS does for DALS packages

We treat your DALS scope as one coordinated package, not a pile of line items. That means a single contract, a single point of accountability, and net-plus-fee transparent pricing — you see the fixture cost and our fee, nothing buried in between.

Submittals and compliance come standard. We assemble DALS cut sheets, compliance documentation, and substitution data into submittal-ready packages, then track every release from purchase order to job-site delivery so lead-time slips surface early — not on the critical path.

Our platform indexes 32 DALS products — cut sheets and specification data our team uses to verify fixture selections, catch spec conflicts, and produce accurate submittals fast.

How procurement works with BLS

1

Send your schedule

Share your fixture schedule or spec — we scope the full DALS package and any related lines under one contract.

2

Priced package with lead times

You get a leveled, net-plus-fee priced package with current lead times on every line — transparent from day one.

3

Designer-approved substitutions only

If alternates make sense, we present them side by side. Nothing changes without designer approval — spec integrity holds.

$847M+Procurement Value Managed
2,400+Projects Completed
180+Manufacturer Partners
40%Timelines Cut By Up To

DALS procurement FAQ

How do I get DALS pricing?

Send us your fixture schedule, spec sections, or drawings and we return a complete priced DALS package — transparent net-plus-fee pricing with current lead times on every line. Book a meeting or create a free account to get started; most packages are priced within days, not weeks.

What are typical DALS lead times?

DALS lead times vary by product family, finish, and factory backlog — standard commercial fixtures often run a few weeks, while engineered or custom configurations can run longer. We confirm current lead times at quote and then track every release from PO to delivery, so you always know where each fixture stands.

Can you handle DALS submittals?

Yes — submittals are included with every package. We index 32 DALS products, which lets us assemble complete, accurate submittal packages with cut sheets and compliance documentation ready for designer and engineer approval.

Can you quote alternatives to DALS fixtures?

Yes — when value engineering makes sense, we present alternates side by side with the specified DALS product, with pricing, lead times, and performance data. Substitutions only move forward with designer approval; we never swap fixtures behind the spec.

Get DALS pricing for your next project